Inspect materials
carefully before installation. Any Material installed with obvious defects
will not be warranted.
Installation Checklist
|
|
Engineered Bamboo Flooring Glue
or Nail Down
Engineered bamboo flooring is a versatile
alternative to solid bamboo flooring due to its stability. Solid bamboo
flooring typically expands and contracts across the width of the boards
when exposed to changes in humidity whereas engineered flooring has a
cross-ply construction that minimizes movement when humidity changes
occur. This type of construction is dimensionally stable thereby allowing
the flooring to be installed below grade as well as on grade and above.
GreenWood’s engineered bamboo has a multi-ply
construction and can be installed over most sub-floors. This flooring has
been shipped from the factory with a 8-11% moisture content (+/- 2%). See
our information and installation guidelines below.
ALL materials must be carefully inspected before
installation. Bamboo is a natural product
containing characteristics such as variations in color and graining.
Mother Nature is anything but consistent and species will differ in the
amount of color and grain variations. It is the customer’s and the
installer’s responsibility for final inspection prior to installation.
When installing a pre-finished bamboo floor, be sure to blend the bamboo
from several cartons to ensure a good grain and shading mixture throughout
the installation.
Warranties do not cover materials with visible
defects once they are installed. Variation
in color and grain pattern is NOT considered a defect. The National Wood
Flooring Association’s standard for "off quality" product is 5%. The
installer can use some of these pieces as starter planks or in places such
as under refrigerators or closets where small defects will not be noticed.
TOOLS: Basic tools
used in all types of wood installations are required. A preferred nail gun
is a Bostitch Floor Runner (LHF97125 –2 or LHF 3297 –2) with 1 1/4", 20
gauge staples or a Power Nailer models #200 or #250 (using the 1/2"
adapter) with 1 1/4" or 1 1/2" cleats. Improper use of a power nailer or
installation straps can mark the edges of the flooring. Wood flooring
straps are usually required for a glue-down installation. (Don’t use
straps made for laminate material)
JOB SITE CONDITIONS:
IT IS THE INSTALLER’S RESPONSIBILITY TO DETERMINE THE SUITABILITY OF
INSTALLATION BASED ON ENVIRONMENTAL AND STRUCTURAL CONDITIONS. ALL
SUB-FLOORS MUST BE CLEAN, DRY, LEVEL (3/16" – 10 FOOT RADIUS; 1/8" - 6
FOOT RADIUS) AND STRUCTURALLY STABLE.
The following are some items that should be in place
prior to installation
EXTERIOR
CONDITIONS:
- Gutters and
downspouts should be placed to drain water away from the building. The
same caution applies to sprinkler systems that should be pointed away
from the structure.
- Soil surrounding the structure should be graded
properly to drain water away from the site.
- The driveway and sidewalks should be paved
CONCRETE SLAB:
The concrete slab should have been installed for
at least 60 days.
Use a urethane adhesive such as Bostik’s BEST.
A vapor barrier should have been installed under
the slab.
Moisture testing of the slab should not take
place before 60 days after pouring the concrete. A calcium chloride test
should show less than three (3) pounds of moisture vapor emission per
1,000 square feet before the wood is installed. On jobs that have a high
test result, use Bostik’s MVP as a moisture barrier. Visit
www.bostik.com for the
manufacturer’s instructions.
INTERIOR CONDITIONS:
All "wet trades" including painters should have
completed their work.
The building should be enclosed and weather tight
with heating, air conditioning and ventilation systems complete and
operating for at least 48 hours prior to installation.
If there is a crawl space, a 6-mil minimum black
polyfilm must be installed over the entire ground area. Joints should be
overlapped and taped.
The temperature should be between 60 to 80
degrees with the relative humidity between 30 and 50 percent.
If there is a wood sub-floor, the moisture
content must be within 4 percent of the bamboo flooring.
Lightweight Concrete:
Lightweight concrete that has a dry density
of 100 pounds or less per cubic foot is not suitable for engineered bamboo
floors. To test for lightweight concrete, scrape a coin or key across the
surface of the subfloor. If the surface powders easily or has a dry
density of 100 pounds or less per cubic foot, do not install our
engineered wood floor
Wood Sub-floors:
Wood sub-floors need to be nailed or secured
with screws. The sub-floor should not exceed 12% moisture prior to
installation. If the sub-floor is single layer and less than 3/4" thick,
add a single cross layer for strength and stability (minimum 5/16" thick
for a total 1" thickness).
Underlayment grade OSB is a suitable sub-floor. Particleboard is not an
acceptable sub-floor for staple or nail down installation but can be used
as a sub-floor in glue down installations. When installing over existing
wood flooring, install at right angles to the existing floor.
Sub-floors Other Than Wood or Concrete:
Perimeter glued resilient vinyl and rubber tiles are unacceptable
underlyments and must be removed. Terrazzo, tile and any other hard
surfaces that are dry, structurally sound and level are suitable as a
subfloor for our engineered bamboo flooring. The surface must be sound,
tight and free of paint, oil, adhesive, wax, grease and dirt. Terrazzo,
ceramic tile or any smooth, sealed surface must be scuffed to assure
adhesive bonding.
Radiant Heated Sub-floors:
DO NOT FLOAT BAMBOO OVER A RADIANT HEAT SYSTEM. Before installing over a
radiant heated floor, turn off the heat and wait until the floor has
reached room temperature. After installing the floor, gradually return the
heat to the previous setting. When radiant heat is installed in concrete
or mortar beds, it is very important to operate the heating system until
these beds are completely dry before installing your bamboo flooring.
Operate the heating system until the humidity in the structure stabilizes
to the average level expected for the area in which the bamboo floor will
be installed. Then allow the bamboo to acclimate to this humidity level
before installation by racking (spreading) the flooring over the space in
which it will be installed. The sub-floor surface must never exceed 70 F.
in temperature.
Acclimation:
Except for areas that are very
dry, no acclimation is required. In areas that are constantly very dry,
the bamboo flooring will need to lose some of its moisture content prior
to installation. To acclimate, store the boxes with the wrapper removed in
the area where it will be installed for 3-5 days or until the moisture
content is reduced to within 6-8% (25-50% relative humidity).
GLUE DOWN INSTALLATION:
There are two ways to install when
using urethane adhesive; wet lay or dry lay:
- Wet lay, meaning to lay directly into wet
adhesive, is typically the quickest method for installing, and
- Dry lay, meaning to allow the adhesive to
flash or to tack up, which provides a green grab and less opportunity
for floor movement prior to curing.
When using urethane adhesive, either method is
acceptable. Note: The dry lay method is recommended in high humidity areas
or when installing over existing sheet vinyl or non-porous material.
Follow all guidelines whether you choose to install using the dry or wet
method.
Wet Lay Method:
Select a starter wall. It is recommended to start
the installation along an exterior wall; it’s more likely to be straight
and square with the room. Measure out from the wall the width of two
planks, mark each end of the room and snap your chalk line. To ensure
alignment, secure a straight edge on the chalk line before spreading the
adhesive. This is a critical part of the installation since this will
prevent side movement of the planks that can cause misalignment.
Installing the starter row correctly is extremely important. If this is
not perfect, the job will not be acceptable
Install the first row of starter planks with the
tongue side of the plank facing the straight edge and secure into
position. Pull the planks tight together at seams and tape with 3M Blue
Masking Tape to prevent movement.
After the starter rows are secure, spread
approximately 18-24" of adhesive the length of the initial row. Never
spread more adhesive than can be covered. Follow the open time
recommendation listed in the instructions on the adhesive label.
Place tongue into groove and press firmly into
adhesive. Never slide planks through adhesive.
Never work on top of the flooring when installing
with the wet lay method.
Dry Lay Method:
Start by selecting your starter wall and measure out from the wall
30" when installing our 4-7/8" wide planks. Snap chalk line. Apply
adhesive from the chalk line out 1½". When using the urethane adhesive,
allow it to flash as per the instructions. Secure your starter rows with
a straight edge (2’X4’). Install planks and secure with 3M Blue Mask
Tape as you continue throughout your installation. If you must work on
top of newly laid flooring, use a kneeling board.
NAIL DOWN INSTALLATION:
Before
installation of the engineered flooring begins, install a 15 pound roofing
felt over the sub-floor.
- When installing the planks, you must staple or
nail 1"-2" from the ends and every 4"-6" along the edges. This will help
insure a satisfactory installation. It is best to set the compressor PSI
at 80-85 pounds to keep the staples from going through or breaking the
tongues. Improper stapling techniques can cause squeaks in the floor.
Place the planks with the tongue facing away from
the wall. Use brads or small finishing nails to secure (face nail) the
first starter row along the wall edge 1"-2" from the ends and every
4"-6" along the side. Countersink the nails and finish with filler.
Blind nail at a 45-degree angle through the
tongue. Nail 1"-2" from the ends and every 4"-6" along the sides. It
will be necessary to blind nail the next 2 rows. A Stanley BT35 brad
nailer with 1"-1"-/38" brads can also be used to blind nail. Continue
the installation using the engineered flooring stapler. Nail or staple
the flooring 1"-2" from the end and every 4"-6" along the edge tongue.
Click
here to download bamboo engineered flooring instructions.
|